Lane closed through March for South Beltway project

LINCOLN, Neb. (KLKN) — Starting March 1st, the outside lanes on N-2 between 98th and 134th Streets will be closed down as a part of the Lincoln South Beltway project, according to the Nebraska Department of Transportation (NDOT).
The closure is expected to last through the month of March. NDOT says access to priorities will still be maintained.
For more information, visit www.facebook.com/NebraskaDOT/.
Weather permitting, the outside lanes on HWY N-2 from 98th Street to 134th Street will be closing on March 1, 2021. Work is anticipated to take 3 weeks.
Please remember to proceed with caution when traveling through the work zone! pic.twitter.com/Kd0dIXaNn0
— Lincoln South Beltway (@LNKSouthBeltway) February 26, 2021